Test Plan Master
The Test Plan Master binds physical Item Groups to standardized inspection protocols across distinct manufacturing milestones (Incoming / IQC, In-Process / PQC, Final / FQC). By bundling multiple individual Quality Parameters into a cohesive plan, it drives automated tolerance evaluation during Quality Control transactions.
/testplanmstindex).đī¸ Test Plan Architecture
A Test Plan acts as an operational bridge between inventory classification and inspection parameters:
flowchart TD
ItemGroup["Item Group (e.g., Fasteners, Raw Steel, Castings)"] --> TestPlan["Test Plan Master (Stage: Incoming / IQC)"]
TestPlan --> Param1["Parameter 1: Outer Diameter (System: 10.00 - 10.05 mm)"]
TestPlan --> Param2["Parameter 2: Hardness (System: 45.0 - 50.0 HRC)"]
TestPlan --> Param3["Parameter 3: Surface Rust (User: Pass / Fail)"]
TestPlan --> QC["Automated Pull into Quality Control Transactions"]đ ī¸ Step-by-Step Test Plan Management
1. Creating a Test Plan Header
- Navigate to Test Plan Master and click Create New.
- Test Plan Name: Enter a distinctive title (e.g., IQC Plan - Cold Rolled Steel Sheets). Must be unique across all test plans.
- QC Stage: Select the relevant inspection stage:
Incoming (IQC): Verification of raw materials, parts, or purchased items upon arrival.In-Process (PQC): In-line fabrication or machining checks.Final (FQC): Pre-dispatch or finished goods verification.
- Item Group: Select the inventory item category that this test plan governs.
- Click Save. The system assigns a unique 6-digit Test Plan Code and navigates to the Details screen.
2. Linking Quality Parameters
A Test Plan header requires linked parameters to be functional:
Open Parameter Checklist
From the Test Plan Details page, click Add / Delete Parameter.
Select Applicable Standards
The system presents a checklist of all active Quality Parameters configured in the system. Check the boxes corresponding to the dimensions, chemical compositions, or visual attributes required for this item group.
Save Inspection Protocol
Click Save. The selected parameters are immediately linked to the plan and displayed in the Linked Parameters grid.
3. Rapid Rollout with Plan Duplication (Clone)
When creating similar inspection protocols for related item groups or different stages:
- Open the existing, configured Test Plan in Details view.
- Click Duplicate on the top toolbar.
- In the duplication modal:
- Provide a new Test Plan Name.
- Select the target QC Stage and target Item Group.
- Click Duplicate.
- The system creates the new plan and automatically duplicates all linked parameters in a single operation, eliminating repetitive manual data entry.
4. Comprehensive Excel Audit Export
Click Export to Excel on the master index to generate a two-sheet compliance workbook:
- Sheet 1 (
Test_Plan_Master): Header details including Plan Code, Plan Name, QC Stage, Item Group Code/Name, and Active Status. - Sheet 2 (
Linked_Parameters): Detailed mapping table showing every linked parameter code and parameter name per test plan.
đ Critical Business Validations & Rules
| Validation Rule | Condition | System Behavior |
|---|---|---|
| Unique Plan Name Guard | Test Plan Name already exists in the system | Rejection: “Test Plan Name already exists”. |
| Stage & Item Group Uniqueness | Attempting to create a second active plan for the same Item Group and QC Stage | Rejection: “Active Test Plan for same QC Stage and Item Group already exists.” Prevents ambiguity during automated QC inspection generation. |
| Downstream QC Delete Lock | Attempting to delete a Test Plan that has been used in any historical QC inspection | Hard block: Verifies historical inspection transactions and prohibits deletion to protect quality compliance records. |
| Active Status Routing | Inactive Test Plans (IsActive = N) | Inactive plans are excluded from automatic QC inspection matching. When an item group has only inactive plans, QC treats the item group as lacking a test plan (mandating Manual Mode). |