Indent Analysis Report
Indent Analysis Report - User Guide
1. Introduction đ
The Indent Analysis Report is a critical tool for the Procurement and Supply Chain departments. It tracks internal purchase requisitions (Indents) from the point of creation to their conversion into a Purchase Order or Goods Receipt.
âšī¸
Purpose of this Report:
- Pipeline Visibility: Monitor all active and historical purchase requests.
- Lead Time Management: Identify delays in the procurement cycle using color-coded aging.
- Fulfillment Tracking: Ensuring that critical raw materials or components are ordered on time.
- Audit Trail: Review authorization status and specialized project notes for each request.
This module is primarily used by Purchase Managers, Store Keepers, and Production Planners.
2. Report Types & Performance Indicators đ
A. Pending Indent Report
- Purpose: Focuses on unfulfilled requisitions that are still in the pipeline.
- Unique Feature: Visual Aging System:
- The system compares the Aging (days since request) against the Lead Time (expected fulfillment window) to assign a status color:
- đĸ Green: Under 33% of Lead Time (Safe).
- đĄ Yellow: 33% to 66% of Lead Time (Monitor).
- đ´ Red: 66% to 100% of Lead Time (Urgent).
- âĢ Black: Exceeding Lead Time (Escalate).
- Key Data: Required-by Date, Expected Date, Aging Days, and Fulfillment status.
B. Indent Register Report
- Purpose: A comprehensive history of all indents created within a specific date range.
- Currency Flexibility: Can be viewed in Base Currency (INR) or Foreign Currency for imported components.
- Key Data: Indent Number, Item/Brand details, Qty, Rate, Amount, and specific Procurement Notes.
3. Data Visibility & Insights đ
| Data Category | Key Fields Visible |
|---|---|
| Material Details | Item ID, Item Short Name, Brand, Stage (RM/PM/SA), and HSN Code. |
| Quantities | User Qty, Final Qty, Standard UOM, and Alternate UOM (with conversion factors). |
| Procurement Audit | Requestor ID, Authorized By (Yes/No), Lead Time, and Indent Status (Open/In Process/Closed). |
| Partner Info | Preferred Party Group, Party Name, and Payment Terms. |
4. Source Transactions đ
The report engine integrates data from the following transaction points:
- Purchase Indent: Primary source for requirements and quantities (
Indent,Indent1). - Purchase Status: Tracks the lifecycle stage of each request (
Indentstatusmst). - Goods Receipt (GRN): Used to identify which indents have been fulfilled and should be removed from the “Pending” list (
Grn1). - Inventory Master: Provides lead times, UOM conversions, and category details (
Inventorymst).
5. Using Global Filters đ ī¸
- Report By: Narrow your analysis by Party Group, Party Name (for vendor-specific indents), Item Group, or a specific Item.
- Unit Filter: Run a consolidated report for “All Units” or focus on a specific manufacturing location.
- Authorization Status: Filter by
isauth(Authorized/Wait) to track requests awaiting manager approval.
6. Best Practices / Tips đĄ
- Identify Critical Bottlenecks: Regularly filter the Pending Indent Report for Black and Red color codes to prevent production shutdowns due to missing materials.
- Validate Lead Times: If items consistently show up as “Black” despite prompt ordering, the Lead Time in your Item Master may need to be updated to match current market conditions.
- Alternate UOM Monitoring: In the Indent Register, pay close attention to the Qty1 (Alternate Qty) column if you buy in one unit (e.g., Tons) but consume in another (e.g., Kilograms).
- Notes Audit: Review the Non-Standard Note column for any special instructions or deviations requested by the user.